Skip to the content

New Albany Road/Fodor Road Maintenance of Traffic

New Albany, OH

This project included the installation of a roundabout on top of an existing three-legged, multi-lane intersection that serves a highly commercial area, requiring non-stop access. The six-phase maintenance of traffic plan developed by EMH&T engineers maintained traffic and access to adjacent businesses at all times. In addition, as pieces of the roundabout were built, the phased plan allowed traffic to flow using the new route, ultimately preparing drivers for the new traffic pattern.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us