Skip to the content

Fields-Ertel Road Roundabout

Hamilton/Warren Counties, OH

EMH&T provided preliminary engineering and detailed design of this modern roundabout intersection improvement. Through a study of intersection alternatives, EMH&T determined that a roundabout would provide similar traffic relief at half the cost of a signalized intersection, with a fraction of the right-of-way impacts. A roundabout was selected as the preferred alternative and advanced through detailed design. Construction is scheduled to begin in 2016.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us