Skip to the content

SR-331 Bridge over I-70

Saint Clairsville, OH

EMH&T designed a two-span replacement bridge along SR-331 as part of the larger I-70/US-40/SR-331 interchange improvement project. The new steel girder bridge is supported by 30-40 foot tall wall type abutments and a central cap and column pier. Each substructure is founded on underlying bedrock. The replacement structure will be constructed on a new alignment to minimize impacts to the public and will feature a wider deck that includes an added turn lane as well as a raised sidewalk for greater vehicular and pedestrian safety.  (BEL-331-1529, PID 80599)

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us