Skip to the content

Landings at Maple Bay

Buckeye Lake, OH

EMH&T was hired to prepare the initial master plan concepts for 176 Epcon units as well as the overall development plan, final development plan, and to obtain all associated approvals. Unique services for this work included providing a marina with direct access to Buckeye Lake; mitigating, preserving and enhancing existing wetlands on site; redirecting an existing county road onto a proposed bridge to facilitate access to the lake; incorporating bio retention; extending public sewer and water to and through the site; and preparing extensive archaeological surveys. The project required annexation, planning, zoning, environmental, civil engineering, surveying and graphic design. Due to the complexities associated with the unique aspects of the site, extensive coordination with numerous stakeholders was critical to the project’s success.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us