Spectra (Zink) Compressor Station

EMH&T designed site plans for construction of a nearly five acre compressor station for Eureka Hunter Pipeline. Approximately 200,000 cubic yards of earth was moved to develop the site which includes a pipeline interconnect facility and an enclosed compressor building. EMH&T was responsible for the site prep, grading, drainage, bid documents, and erosion and sediment control design including coordinating with Eureka Hunter’s surveyors and engineers.