EMH&T provided professional engineering services for the construction of a pipeline interconnect facility for Eureka Hunter Pipeline. Approximately 100,000 cubic yards of materials was imported to the site to bring the final elevation of the pad above the 100 year flood plain elevation. The two and half acre pipeline pad was constructed to assist Eureka Hunter Pipeline’s movement of products throughout their pipelines. EMH&T was responsible for the site prep, grading, drainage, permitting and erosion and sediment control design including coordinating with Eureka Hunter’s surveyors and engineers.