Skip to the content

Lafferty Trunk Line – Ohio Gathering Co. LLC

EMH&T provided professional engineering and construction administration services for this large diameter wet gas pipeline in eastern Ohio, designed to collect several lateral pipelines in the area. A range of construction methods were utilized including direct-bury, conventional bores, and Horizontal Directional Drill (HDD) bores. The project also included the planning and design of surface sites on either end of the line for the placement of above-ground valve and interconnecting pipeline equipment.

Project #6

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us