Skip to the content

Dunn (RexTex) Interconnect

EMH&T provided professional engineering services for the construction of a pipeline interconnect facility for Eureka Hunter Pipeline. The half an acre interconnect pad included metering facilities for the transfer of dry Utica gas to the Texas Eastern pipeline. EMH&T was responsible for the site prep, grading, drainage, bid documents and erosion and sediment control design including coordinating with Eureka Hunter’s surveyors and engineers.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us