Skip to the content

Carbide Liquid Handling Facility

EMH&T provided engineering services for the construction of a liquid handling facility including rail and truck loading/unloading operations. Located in Carbide, WV the facility will allow Eureka Hunter Pipeline to process Natural Gas Liquids (NGL’s) from their pipelines and ship them via rail and truck. EMH&T coordinated with Eureka Hunter Pipeline’s engineers to develop the most efficient design for the rail facility as well as the truck routing. EMH&T performed containment calculation for the tank spill containment areas as well as obtained required plan approvals from CSXT. EMH&T was responsible for the survey, site prep, grading, drainage, track, permitting, spill containment, SPCC plan, and erosion and sediment control.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us