Skip to the content

SUM-8-1.75 Bridge Replacement

Summit County, OH

EMH&T performed a Phase I History/Architecture survey for the SUM-8-1.75 bridge replacement in the City of Akron, Ohio. Due to the complexity of the bridge and the desire to maintain traffic during the replacement, EMH&T surveyed a number of surrounding neighborhoods on the north edge of downtown Akron. The survey demonstrated that there were no historically significant houses or neighborhoods that would be impacted by the proposed bridge replacement.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us