Clime Road Waterline

Columbus, OH

EMH&T provided on-site resident project representation for the construction of 5,300 lf of waterline main, ranging from 12” to 6” ductile; the transfer, relocation and installation of 28 water service connections; the transfer, relocation and installation of 16 fire hydrants; the adjustment to grade of 27 standard valve boxes; and the setting and adjustment of 15 heavy duty valves. Our responsibilities included the preparation of daily inspection reports, reporting payable items to the project lead inspector, witnessing the installation of the items listed above, verifying and confirming the GPS and coordinates as supplied by the contractor, blocking hydrants and bends, prepared accurate as-builts for chlorination test and final delivery for the City, witnessed the cleaning, chlorination , and static pressure testing of all water mains, and prepared pre-final, final, and 1 year warranty punch lists.