Skip to the content

Central College Sanitary Sewer

Westerville, OH

EMH&T provided fulltime on-site resident project representation from preconstruction meeting through final inspection walkthrough for the installation of 2,100 LF of 18” PVC sanitary sewer with flood plan. This included the installation of 7 manholes structures, 7 service taps and the abandonment of 7 septic systems. The actual sanitary mainline was bored, with open-cut on private property 12’ deep.

Let’s connect.

There’s an easy way to see how we can help. Let’s talk about it.

Contact us